Looks like you're in United States. See Chippie for United States, with local pricing and tax.
Go to the United States site- Home
- Electricians
Job management software for sparkies
Quote electrical work on site, keep the maintenance cycle on the schedule, and send the invoice before you have packed up. Free up to 20 jobs a month.
Start freeNo card needed. Pro is $25 a month for two users, Team $45 for four.
Key takeaways
- Quote rewires, switchboard upgrades and LED retrofits on site, itemised with GST, from the phone.
- Every switchboard, RCD, emergency light and EV charger is kept at its site, with its test results from every visit.
- The SWMS is built by ticking hazards, signed by the crew on site and kept as a signed PDF, on every plan.
- Board location, circuit notes and site access save against the site and carry to the next callout.
- Free under 20 jobs a month, then $25 a month including two users.
How an electrical job runs in Chippie#
A switchboard upgrade in Hamilton South: quoted at the board, done, invoiced and paid. Callouts and maintenance runs go the same way.
-
Quote it on site
Switchboard, downlights, cable and labour itemised with GST, a photo of the old board attached, sent before you leave.
-
The client accepts
Sophie accepts from the email. The quote becomes the job, and its invoice is drafted from the same lines.
-
Do the work
The crew signs the SWMS on site. Board location and circuit notes sit on the site, and the new board's photo and test results go on the job.
-
Invoice before you pack up
Complete the job and the invoice is ready, with your bank details on it. A callout billed the day it is done is a callout that gets paid.
-
Paid
Mark it paid when the transfer lands. On Pro and Team, an invoice paid in Xero shows as paid here too.
Quote #24Job #19Invoice #19
Sophie Martin
Kemp Street, Hamilton South
Pending quote Accepted Ready In progress Pending Sent Paid
Description
Switchboard upgrade and lighting. Replace the old fuse board with a new switchboard with circuit breakers, fit eight LED downlights in the living room, and add a double weatherproof power point on the back patio. Labour, board and fittings on their own lines.
Photos
Line items
- Switchboard, circuit breakers and RCDs$1,150.00
- Eight LED downlights$520.00
- Weatherproof double power point$180.00
- Cable and fittings$330.00
- Labour, two days$1,300.00
Total$3,480.00
Synced to Xero
Parts and labour keep their own lines on the invoice, so the client sees what the switchboard and the hours cost, and the cable you picked up on the way never drops off the bill.
What Chippie does for electricians#
- Itemise the quote while you are still at the board. Parts and labour as separate lines, GST worked out, sent before you leave. A switchboard upgrade quoted on site is a switchboard upgrade the client can say yes to today.
- Every board keeps its test results. Add the ready-made electrical types once in Settings: switchboards, RCDs, emergency and exit lighting, EV chargers. Each one at a site keeps its insulation resistance, earth continuity and trip times from every visit, and maintenance rounds run as recurring jobs.
- The SWMS before you open the board. Tick the hazards from the electrical library, isolation and lock-out, roof spaces and ladders among them, and the crew signs on their phones on site. The finished SWMS is a signed PDF in your vault, on every plan including free.
- The callout that gets invoiced. Small jobs are the ones that quietly never get billed. Send the invoice on site when the job is finished, and the day's work is billed that day rather than remembered on Friday.
What changes when the paperwork moves to the phone#
| The old way | With Chippie | |
|---|---|---|
| Quoting | Handwritten, and finished at the kitchen table that night | Itemised on site and sent from the phone in minutes |
| No signal | Nothing works in a switchroom or a basement car park | Jobs and quotes open and edit with no signal, then upload |
| Maintenance rounds | Due dates remembered, or not | Recurring jobs put the next visit on the schedule |
| Test results | On a pad, typed up at night | Recorded against each board on the job |
| SWMS | A photocopy signed on the bonnet of the ute | Hazards ticked, signed on phones, kept as a PDF |
| Invoicing | Days behind the work, so the small jobs slip | Sent on site when the job is finished |
Electricians: your questions#
Can Chippie track test and tag due dates?
Can I show my electrical licence number on quotes and invoices?
Does Chippie do SWMS for electrical work?
Does Chippie work with no signal?
Have a play. It is free.
Free while you are small. No card, no lock-in.
Have a play